Stress Relieving Oven

We offer stress relieving/post weld heat treatment in our massive 7x7x25m heavy duty oven/furnace. Positioned on a track, this allows us to easily load and remove project from the oven.

Maximum Gas Supply: 70kPa
Minimum Gas Supply: 7kPa
Combustion Chamber Volume: 936m3
Opperating Temperature: 300-800°C
Maximum Temperature: 1000°C

Privacy Policy | Copyright © 2019 – Thornton Engineering Australia Pty Ltd.