Overview
Thornton Engineering was engaged to deliver the detailed mechanical design, fabrication, supply, and transport of a new Absorber Vessel for a major processing facility in South Australia. The existing unit had reached end of life, and the upgrade allowed the client to implement a refined design developed through prior engineering studies.
The selected configuration provides roughly 30% greater absorption capacity and improved operating efficiency, delivering a meaningful uplift in long-term performance.
The project was completed and delivered in full compliance with strict quality, safety, and schedule requirements. The upgraded absorber is now contributing to improved process performance and long-term operational reliability for the facility.
Additional scope included platforms and ladders, insulation interfaces, internal components, and transportation supports.
Specification
| Year | 2025 |
| Dimensions | 27.5 m (L) × 3.75 m (H) × 4.3 m (W) |
| Location | South Australia |
| Weight | 225T |