Overview

We fabricated a number of sections for the Carrapateena Underground Mine, which included:

  • 7T for the head end of a conveyor including; handrails, grating & treads.
  • The tail end of the same conveyor
  • Supports for the same conveyor including; handrails, grating & treads.
  • Crushing Station Crane Access Platform
  • Crushing Station Mantle Storage Frame
  • Crushing Station Tipples
  • The head end of another conveyor
  • Crushing workshop floor & mantle maintenance.
  • Crushing Station Lower Stairwell
  • Crushing Station Under Pocket Access Door
  • Crushing Station 5T maintenace crane
  • Collection Conveyor Supports
  • Picking Conveyor
  • Tramp Magnet Support
  • Picking Station
  • Bunker Conveyor
  • Crushing Station Stairwell Airlock
  • Crushing Station Rockbreaker Enclosure

Our scope for this project included:

  • Mechanical design and detailing
  • Material supply
  • Fabrication
  • Non-destructive testing (NDT)
  • Hydrotesting
  • Blast and paint
  • Cladding & Insulation
  • Transportation to site

Specification

Year2019
LocationPernatty, South Australia
MaterialCarbon Steel with Wear Plate Liners
Weight289.5T