Overview
We fabricated a number of sections for the Carrapateena Underground Mine, which included:
- 7T for the head end of a conveyor including; handrails, grating & treads.
- The tail end of the same conveyor
- Supports for the same conveyor including; handrails, grating & treads.
- Crushing Station Crane Access Platform
- Crushing Station Mantle Storage Frame
- Crushing Station Tipples
- The head end of another conveyor
- Crushing workshop floor & mantle maintenance.
- Crushing Station Lower Stairwell
- Crushing Station Under Pocket Access Door
- Crushing Station 5T maintenace crane
- Collection Conveyor Supports
- Picking Conveyor
- Tramp Magnet Support
- Picking Station
- Bunker Conveyor
- Crushing Station Stairwell Airlock
- Crushing Station Rockbreaker Enclosure
Our scope for this project included:
- Mechanical design and detailing
- Material supply
- Fabrication
- Non-destructive testing (NDT)
- Hydrotesting
- Blast and paint
- Cladding & Insulation
- Transportation to site
Specification
Year | 2019 |
Location | Pernatty, South Australia |
Material | Carbon Steel with Wear Plate Liners |
Weight | 289.5T |
Photo Gallery
Downloads & Media
Further Information
David Thornton +61 (0) 3 5274 3180
sales@thorntoneng.com.au