skip to Main Content

Overview

To further assist Melbourne’s need for greater accessibility for moving around the City, Thornton Engineering was part of thePalmer’s Road Bridge upgrade for bikes and pedestrians.  Working with a valued client we completed the 80.1m long bridge, weighing 247.2T.

Our scope included; workshop detailing, supply and fabrication of the bridge, handrail, support cleats & brackets, bearing plates, cover plates, pipe supports, shear studs, fasteners, cladding, trial assembly & transportation to site.

Thie bridge was done as part of the Federation Trail upgrade. This upgrade consisted of 8 roads; Duncan, Forsyth intersection, Palmers, Sayers, Dohertys, Leakes, Derrimuts and included a further 37 road repairs.

Specification

Year2021
LocationMelbourne, Victoria
Dimensions80.1m (L) x 6.5m (W) x 5.2m (H)
Weight247.2T
MaterialLow Temp Carbon Steel (Up to 450 Grade)

Photo Gallery

Downloads & Media

Further Information

David Thornton +61 (0) 3 5274 3180
sales@thorntoneng.com.au

Back To Top
×Close search
Search