skip to Main Content

Overview

We fabricated a pedestrian bridge for the West Gate Tunnel Project, part of an upgrade to the pedestrian and cycling network that connects the suburbs of Melbourne. The 130 tonne bridge incorporated plate steel box sections and was manufactured to the highest quality standards. Our scope of work included:

  • Detailed design
  • Material supply
  • Fabrication
  • Non-destructive testing (NDT)
  • Blast and paint
  • Transportation to site

Specification

Year2020
LocationAltona, Victoria
Material Carbon Steel
Plate ThicknessUp to 42mm
Weight~130T

Downloads & Media

Further Information

David Thornton +61 (0) 3 5274 3180
sales@thorntoneng.com.au

Project Video

Photo Gallery

Back To Top
×Close search
Search