Overview
We fabricated a pedestrian bridge for the West Gate Tunnel Project, part of an upgrade to the pedestrian and cycling network that connects the suburbs of Melbourne. The 130 tonne bridge incorporated plate steel box sections and was manufactured to the highest quality standards. Our scope of work included:
- Detailed design
- Material supply
- Fabrication
- Non-destructive testing (NDT)
- Blast and paint
- Transportation to site
Specification
Year | 2020 |
Location | Altona, Victoria |
Material | Carbon Steel |
Plate Thickness | Up to 42mm |
Weight | ~130T |
Downloads & Media
Further Information
David Thornton +61 (0) 3 5274 3180
[email protected]