Rosanna Rail Bridge Crossing

177T of steel, including two 63 tonne beams, were required for the Rosanna rail bridge crossing over Lower Plenty rd. Always great to be involved in local infrastructure projects and heavy plate work fabrication.

Our scope included; Detailing, Supply and Fabrication of two I-griders 33m+ long, two cross beam girders, stiffeners, walkway supports, shear studs, NDT, surface treatment and delivery.

Plate Thickness: up to 70mm
Project: 17071

For further information on the project including a video of the install, see the article below.